Ouitble Electrolytic Polarized Capacitors 20pcs 450V 22uF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage

€ 15,92
FREE Shipping

Ouitble Electrolytic Polarized Capacitors 20pcs 450V 22uF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage

  • Brand: Unbranded
Sold by:

Ouitble Electrolytic Polarized Capacitors 20pcs 450V 22uF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage

  • Brand: Unbranded

€ 15,92

Save € 12,00 (42%)

RRP

€ 27,92
In stock
FREE Shipping
Sold by:

€ 15,92

Save € 12,00 (42%)

RRP

€ 27,92
In stock
FREE Shipping

We accept the following payment methods

Description

Features • Stable Performance Assurance: Enjoy reliable functionality with these high-quality electrolytic capacitors, ensuring consistent performance in your electronic projects • User-Friendly Specifications: Each capacitor features clear markings for voltage and capacitance, making it easy to select the right component for your needs • Exceptional Heat Resistance: Designed to withstand temperatures up to 105℃, these capacitors offer low leakage, low loss, and low impedance for enhanced durability • Ideal for Professionals and Enthusiasts: Perfect for a variety of applications, these polarized capacitors are a great choice for both electronic professionals and hobbyists alike • Versatile Application Range: Suitable for a wide array of electronic projects, these 450V capacitors can be used in tube amplifiers and other high-voltage circuits Features: 1、 electrolytic capacitors with stable performance 2、The specifications of the capacitors is marked on its , convenient to use 3、Heat resisting, low leakage, low loss and low impedance 4、Great choice for electronic professionals or enthusiasts 5、Suitable for a wide range of electronic applications Specification: Features: electrolytic capacitors with stable performance. The specifications of the capacitors is marked on its , convenient to use. Heat resisting, low leakage, low loss and low impedance. Great choice for electronic professionals or enthusiasts. Suitable for a wide range of electronic applications. Specification: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ±20% Operating temperature: 105℃ Dissipation Factor: between0.24 at 20℃/120Hz Dimensions: Approx. 21 x 1m / 0.83 x 0.51in Lead type length: Tin plating copper layer Lead length: 27mm / 1.1inch Type: Polarized Quantity: 20pcs Weight: Approx. 79g Package Included: 20 x Electrolytic Capacitor Package List
  • Fruugo ID: 405298167-859769297
  • EAN: 9301540970138

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels

CE Mark
Safety Warnings: Please do not allow your child to handle this product alone to avoid swallowing or other injuries; adult supervision is recommended.
Ingredients: As shown in the figure

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri 31 October 2025–Thu 06 November 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhenshi Desheng Wangluo Keji Youxian Gongsi
  • Shenzhenshi Desheng Wangluo Keji Youxian Gongsi
  • NO,606-23-220,MeinianGuojiGuangChangZhaoshangJiedaoNanHaidadao yixiShenzhenGuangdong
  • Shenzhen
  • CN
  • 518000
  • GoodLuck856@163.com
  • 8613164761511

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • SINO-SEAR GmbH
  • SINO-SEAR GmbH
  • Feuerbachstrasse 11, 14471 Potsdam, Germany
  • Potsdam
  • DE
  • 14471
  • info@sino-sear.com
  • 4933195130908