20pcs Electrolytic Capacitors Assortment, Capacitor Kit, 450V 22uf 105℃ Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier 2Z7JT

€ 15,73
FREE Shipping

20pcs Electrolytic Capacitors Assortment, Capacitor Kit, 450V 22uf 105℃ Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier 2Z7JT

  • Brand: Unbranded
Sold by:

20pcs Electrolytic Capacitors Assortment, Capacitor Kit, 450V 22uf 105℃ Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier 2Z7JT

  • Brand: Unbranded

€ 15,73

Save € 12,00 (43%)

RRP

€ 27,73
In stock
FREE Shipping
Sold by:

€ 15,73

Save € 12,00 (43%)

RRP

€ 27,73
In stock
FREE Shipping

We accept the following payment methods

Description

Features Anti -thermal Anti -heat: The characteristics of capacitors kits have the characteristics of anti -heat, low leakage, low loss and low impedance, strictly manufactured in accordance with standards, with reliability and high accuracy. Excellent Moisture Resistance: Capacitors have excellent workmanship and use selected materials, which have excellent moisture resistance and reliable performance. Precise Manufacturing Process: Electrolytic polarized capacitors are manufactured using carefully selected electronic components to ensure durability and protection. Wide Application: Long lead axial electrolytic polarized capacitors are widely used in electronic precision instruments, various small electronic equipment, suitable for a wide range of electronic applications. Contains 20 PCS Capacitor Accessories: The capacitor kit contains 20 pieces, which is very convenient to replace broken or damaged capacitor accessories, which can basically meet our needs. Features: 1.Electrolytic capacitors with stable performance. 2.The specifications of the capacitors is marked on its surface, convenient to use. 3.Heat resisting, low leakage, low loss and low impedance. 4.Great choice for electronic professionals or enthusiasts. 5.Suitable for a wide range of electronic applications. Specifications: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ±20% Operating temperature: 105℃ Dissipation Factor: <0.24 at 20℃/120Hz Dimensions: Approx. 21 x 13mm / 0.83 x 0.51in Lead type length: Tin plating  copper layer Lead length: 27mm / 1.1inch Type: Polarized Quantity: 20pcs Weight: Approx. 79g Package Included: 20 x Electrolytic Capacitor Package List
  • Fruugo ID: 383906304-826163941
  • EAN: 9789622181519

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels

CE Mark
Safety Warnings: Please do not allow your child to handle this product alone to avoid swallowing or other injuries; adult supervision is recommended.
Ingredients: As shown in the figure

Delivery & Returns

Dispatched within 2 days

  • STANDARD: FREE - Delivery between Fri 07 November 2025–Thu 13 November 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy