10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Motor with Long Lead Linear Shaft Rod for Precise Motion Control

€ 31,95
FREE Shipping

10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Motor with Long Lead Linear Shaft Rod for Precise Motion Control

  • Brand: Unbranded
Sold by:

10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Motor with Long Lead Linear Shaft Rod for Precise Motion Control

  • Brand: Unbranded

€ 31,95

Save € 15,00 (31%)

RRP

€ 46,95
In stock
FREE Shipping
Sold by:

€ 31,95

Save € 15,00 (31%)

RRP

€ 46,95
In stock
FREE Shipping

We accept the following payment methods

Description

- Experience precise control in your linear motion applications with our 10mm DC 5V 2-phase 4-wire linear screw stepper. - Designed with a long lead linear screw shaft, this product ensures smooth and accurate movement, making it an essential component for automation projects. - The 2-phase 4-wire configuration guarantees stable power transmission and efficient operation, perfect for a variety of tasks in automation. - Easy integration is a key feature, as it operates on a standard DC 5V power supply, allowing for seamless incorporation into existing electrical systems. Key Benefits: - Enables controlled linear motion in robotics, CNC machines, and 3D printers. - Delivers reliable and consistent performance, enhancing the quality of your projects. - Compact size allows for straightforward installation in tight spaces. Applications: - Ideal for robotic arms requiring precise positioning. - Perfect for CNC milling machines needing accurate linear travel. - Excellent for 3D printers that demand controlled movements for high-quality prints. Choose our linear screw stepper for your automation needs and experience the reliability and efficiency that sets it apart from the competition.
  • Fruugo ID: 368140907-797079733
  • EAN: 929285261381

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri 14 November 2025–Tue 02 December 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • HappyHaven
  • Shenzhen Tuku Supply Chain Co., Ltd.
  • 202-5, Jinhe Building, 8 Xinhe Street
  • Maan Tang, Bantian , Longgang, Shenzhen, Guangdong
  • China
  • Guangdong
  • CN
  • 518129
  • caryleroot@outlook.com
  • 13428666765

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Synertrade FR SAS
  • Synertrade FR SAS
  • 9 rue du Bat d'Argent
  • Lyon
  • France
  • Lyon
  • FR
  • 69001
  • info@syner-sarl.cn
  • (+33)774555006
  • https://seller.kuajingmaihuo.com/settle/qualification-service